In Zimbabwe, a business that plans ahead has a real advantage. Costs can change quickly, power cuts add generator and solar expenses, and customers may pay in more than one currency. A budget gives you a fixed point: a clear view of what you expect to earn and spend, against which you can measure every surprise.
This guide builds a budget for a sample metal fabrication workshop in Harare. The workshop and its numbers are examples, shown in plain US-dollar figures. Use the same approach for your own business.
The workshop
Our sample workshop makes burglar bars, gates, steel doors and custom jobs for builders. It has five welders and fitters, a pickup truck and a small office. The owner, Tendai, wants to know whether hiring a sixth worker will pay for itself.
Choose the budget currency
Most of the workshop’s sales and costs are in US dollars, so Tendai budgets in USD. Where a cost or sale is in another currency, he converts it at a cautious rate and marks the line so he can review it later. If you trade in several currencies, decide on one budget currency and stick to it.
Plan the work, not just the money
Tendai’s sales depend on how many jobs the team can finish. He starts by estimating jobs per month:
- Standard items (burglar bars, gates): steady demand, more during the building season.
- Contract work for builders: larger orders that come in blocks.
- Custom jobs: fewer, higher value, unpredictable.
He multiplies the expected jobs by the average price for each type. The result is a monthly sales forecast based on work his team can actually deliver.
Materials and consumables
Steel, welding rods, gas, paint and grinding discs make up most of the direct cost. From last year’s purchases, materials came to about 50% of sales. Because steel prices move, Tendai budgets at 53% to leave a margin for increases.
Fixed monthly costs
| Line | Notes |
|---|---|
| Wages | Five staff, plus the owner’s own salary |
| Workshop rent | Monthly |
| ZESA electricity | Welding uses a lot of power |
| Generator fuel and solar maintenance | For outages |
| Vehicle fuel and repairs | Deliveries and site visits |
| Phones and data | Monthly |
| Licences and insurance | Yearly, spread over twelve months |
| Tool replacement | A monthly set-aside |
Power deserves careful attention. Tendai looks at six months of bills and fuel receipts to get a realistic monthly average rather than relying on memory.
Tax and payroll deductions
If the business is registered for VAT, part of each sale belongs to ZIMRA and should be set aside. Income tax and any other taxes need their own lines, and staff deductions must be planned with wages. Check the current rates and payment dates with ZIMRA. NaliSuite does not claim a statutory payroll calculation for Zimbabwe, but you can set up your own deductions in payroll so the budget and payslips use the same figures.
The plan for an average month
In plain example numbers:
- Sales: 24,000.
- Materials (53%): 12,720.
- Wages including the owner: 5,500.
- Rent, power and fuel: 2,300.
- Vehicle, phones, licences and tools: 1,280.
- Planned surplus before tax: 2,200.
Testing the hiring decision
A sixth worker would cost about 700 a month. Tendai estimates that the extra person lets the team finish four more standard jobs a month, worth about 1,800 in sales. After materials at 53%, those jobs add roughly 850 – a little more than the wage. The budget says the hire pays for itself only if the extra jobs really come in, so Tendai decides to hire once he has a builder’s contract signed for the next quarter.
Keep a buffer
Late payments from builders and unexpected repairs are common. Tendai adds a monthly transfer to a reserve until he has two months of fixed costs saved. It is in the budget like any bill.
Compare every month
At each month end, Tendai places actual figures next to the plan and looks at the three biggest differences. NaliSuite accounting keeps budgets by account, department or project and compares them with actual results whenever you want; the books fill themselves from invoices, bills and payroll. Bank reconciliation checks the figures against your statements.
Share the plan with the team
Tendai shares the job targets with his foreman each month. When the team knows how many jobs the budget expects, they plan their work around it and flag early if materials or power will slow them down. A budget kept in the owner’s drawer cannot do that.
Frequently asked questions
How do I budget when prices change quickly?
Budget costs a little above today’s prices, review monthly, and update your selling prices when costs rise.
Should I include my own salary?
Yes. If the business cannot pay you, it is not yet profitable. Put your salary in the budget as a fixed cost.
What is the first thing to cut if the budget shows a shortfall?
Look for costs that do not bring in sales or keep the business running safely. Keep anything that protects revenue.